Posts tagged with: Metals

Metals

Flynn Ottawa is currently working on the cladding and glazing work for the Ottawa Light Rail Transit. Confederation Line Phase II slated to start November 2021 and run through until 2025. Securing this work is a testament to our relationship-building...
Flynn is currently working on creating Vancouver’s first commercial Passive House building at 825 Pacific Street. A passive house is a voluntary standard for energy efficiency in a building, which reduces the ecological footprint. It results in ultra-low energy buildings...
The fabrication shop in Winnipeg recently completed a kinetic wall that creates a shimmering effect with the wind. The wall is comprised of over 13,000 six by six inches stainless steel plates that move with the wind, which results in...
Tight Job Site No Problem For this Crew. One of Flynn’s Spokane, WA crews completed the exterior cladding package on the 1st Avenue Mixed-Use project. The team lead by Brian Jennen spent most of five months installing Vaproshield weather barrier,...
Stephen Ave. Place is a 42-storey building that was built in Calgary in 1976 and is one of the few skyscrapers in Calgary’s skyline. But at nearly 50 years old, the building was in a dire need of a facelift....
The East Arlington Library is a 47, 249 SF library and recreation facility that our DFW team was awarded the metals scope on. The intertwining of curved and angular elements was inspired by the architecture and automotive designs of the...
Flynn Vancouver has partnered with EllisDon to construct the Royal Inland Hospital Patient Care Tower. This is two-phased project that consists of a new, nine-storey patient care tower as well as significant renovations to the existing emergency department, pediatrics, post-anesthetic...
The first thing our Phoenix crew learned on site, is that security on the Intel – Fab 42 is no joke. They allowed no pictures on site and if you are caught taking a picture you are not allowed to...
Our crews in Saskatoon are used to unpleasant winters and this winter was no exception. While they were working on Miksiw School, Canoe Lake First Nation Saskatchewan they had to brave temperatures of -40 °C/ -40 °F. But our crews...
The Ken and Marilyn Thomson Patient Care Centre at the Michael Garron Hospital will feature 218 medical and surgical beds, more accessible outpatient programs and modern infrastructure that will accommodate new technology. It will also include improved infection control by...