Flynn was the General Contractor for the Toys R Us Project in Hamilton. With the Hamilton branch being very busy, a Winnipeg crew began the work on January 2nd with a Toronto crew lending a helping hand on January 18th. This was 472-square overlay job where we vacuumed the gravel and installed 1 “ ISO and mechanically installed new PVC membrane. We battled the ever-changing weather and high winds but needed to have the work completed by the end of January.

The crew typically does 21 days on and seven days off, but our Winnipeg crew has volunteered to stay an extra week to make it 28 days on site to help complete this project in the given time frame.

Winnipeg and Toronto crew:

Back row from left to right: Tino Ferreira, Manuel Neiva, Jose Vitorino, Waldemar Hetze, Regique Babulal, Wayne Maki, Oleh Paulyna, Kyle Layne, and Luis Martins

Front Row: Glenn Depaulo, Pedro Soares, Kenith Thompson, Mark Martins, Dave Maltez, Walter Plandin, Javier Mercado