The Daimler/Western Star Trucking Plant was a project through A-Tech/ Northwest – a 4,700 square, metal retrofit, reroof. The roof assembly was 1 ½” EPS flute filler (loose laid), ½” HD board (mechanically attached) and a self-adhered .060 MIL Sarnafil PVC. We removed and replaced with new 1,500’ LF of gutter and downspouts. We had to coordinate the removal of many large units on the roof as well as the installation of several TI operations.

We are pleased to share this project won first place in the Low Slope: Re-Roofing category of Sika Sarnafil’s 2018 Project of the Year competition!

General Manager Ryan Low says, “My team put a lot of blood, sweat and tears into this one and I would like to thank them and pay a compliment to our safety director, Royce Heather. We went 17-months claim free, and it has a lot to do with his hard work. I am very impressed by his dedication to sending the guys home safely every night.”