Posts tagged with: Project

The Ford Plant was shut down for nine days beginning on Christmas Eve 2018 ending on January 1st, 2019. During the shutdown, we had 32 roofers, seven sheet metal workers and at times two cranes on board to tear-off 246...
Continue Reading →
The Pylypow Warehouse in south Edmonton was a 42,300 sq. ft. foam panel project consisting of 2 ½”,  4 ½” fire rated and 6” fire rated foam panels including a 2” foam overlay panel. From left to right: Gavin Redford,...
Continue Reading →
The scope of work included removing the existing glass, installing a new Kawneer 2000 skylight frame onto the existing framing and installing new glass, and flashing, which consisted of approx. 5,200 sq. ft. of glass (292) sealed units. We began...
Continue Reading →
One of our Edmonton crews closed off 2018 completing repairs on a dome skylight in the busiest mall in downtown Edmonton. The Edmonton City Center Mall Skylight project, being completed for Oxford Properties Group, consists of new sealed units, high...
Continue Reading →
Gateway at West District – two multi-purpose buildings with main floor retail and seven floors of residential condominiums –  epitomizes the “Total Building Envelope” saying on all of our business cards! This marks our third multi-scope project with developer and...
Continue Reading →
Transcona Library was an architecturally challenging project for Winnipeg’s metal crew, led by foreman Robert Hogue. One challenge the crew faced was the installation of 18-foot vertical wall panels and large angled soffit panels. Flynn was able to utilize TSC...
Continue Reading →
Left to right: Danny Carmichael, Josh Prefontaine, Keegan Sigurdson, Jordan Waldner, Frank Lanouette, Phil Bonneteau (Foreman), Drake Oldenburg, Brendan Proulx, and Mitch Bonneteau. Missing: Pat Bonneteau. The construction for the new Star Building Products store and warehouse is currently underway...
Continue Reading →
Left to right: Steve Gall, Ken Manness and Darren Weigel (foreman). Missing from photo: Ed Spence, Alex Bendel, Matthew Kreuger and Tyler Sumner. This Winnipeg glazing team has been hard at work hand bombing glass up and down scaffold for...
Continue Reading →
Green roof dirt installation on the third floor (taken just before the sedum). The Alt Hotel, in conjunction with Bockstael Construction, is a multi-scope new construction project in downtown Saskatoon at the River Landing. Being both downtown and by the...
Continue Reading →
Work at the Williston Senior Independent Facility involves installing slope insulation on OSB Sheathing roof deck, 2” Polyiso, Smartboard and torch cap. The biggest challenge on this project from the onset has been the schedule delay from the GC in...
Continue Reading →