Amazon is building a huge distribution center called “Project Rose” near the Spokane International Airport. Our scope of work for this project consists of TPO roofing (approx. 7,000 squares on multiple levels), Insulated Metal Wall Panels (approx. 1,300 ea. on...
Continue Reading →
Opening in January 2020, Harrison Medical Center’s Silverdale campus expansion will feature state-of-the-art medical technology, a new acute care facility and provide comprehensive healthcare services to the Peninsula community. This facility will be one of the most energy efficient hospitals...
Continue Reading →
This is a 1,500 square project for the Port of Vancouver (Washington State). The manufacturer on this project is Johns Manville. It is a metal retrofit reroof where we installed 1 ½” EPS flute filler (loose laid), ¼” Invinsa roof...
Continue Reading →
The Daimler/Western Star Trucking Plant was a project through A-Tech/ Northwest – a 4,700 square, metal retrofit, reroof. The roof assembly was 1 ½” EPS flute filler (loose laid), ½” HD board (mechanically attached) and a self-adhered .060 MIL Sarnafil...
Continue Reading →
The crew of Mike Morris (project foreman), Cory Holden, Joe Evje, Dean McClung and Issac Alvarez recently started work at the Boise State University Micron Center for Material Research. We are doing multi-roof levels (RhinoBond & Adhered TPO 80mil roof...
Continue Reading →
Work on the Maryland Live! Event Center in Hanover, MD includes installing 300 squares of Carlisle TPO (new construction roofing) and installing Evo ACM Panels and DriDesign Wall Panels. We are expecting to finish in May, 2019....
Continue Reading →
Work continues on the Becton Dickerson building in Cockeysville, MD. We are doing a roof replacement – a 1,190 square demo replaced with Carlisle EPDM. The installation on this project was challenging. Our crew had to work under a lot...
Continue Reading →
Left to right: Allen Cavanaugh, Brandon Kaczor, Cory Meyer, Philip Bowe and Tess Puta (safety) Not pictured: Tim Kasemodel (project manager). This 15, 500 sq. ft. re-roof job includes asphalt removal and an EPDM 60 mil install. We started during...
Continue Reading →
Left to right: Randy Wold, Gordy Smith, Antonio Ocotoxtle, Samantha Schanus, Joe Myher, Jesse Pesola , Austin Kessler and Tess Puta (safety specialist). Not pictured: Shane Burns (estimator), Luis Amorrortu (project manager), Gary Johnson (roofing manager), and Gordy Smith (roofing...
Continue Reading →
The crew of Willie Waranjo, Mike Halsten, Zach Egge, Darrell Johnson, Esbay Rios, Tony Gartner and Jaime Koecher pictured from left to right are wrapping up this re-roof in Rogers, Minnesota – 14,650 sq. ft. of TPO membrane removal and...