Flynn’s involvement with Old Parkland has spanned more than one phase of renovations, starting with the West Campus. Parkland Hall’s standout feature is its copper dome. More than 3000 interlocking copper tiles make up the stunning 96-foot diameter dome, which...
Continue Reading →
These photos were sent in by metal sheet worker Franchesco from our Calgary branch. Pictured above are metal sheet workers Franchesco (left) and his buddy Dustin on the Gateway Condo site. Below is the condo itself. A big thank you...
Continue Reading →
The crew of Mike Morris (project foreman), Cory Holden, Joe Evje, Dean McClung and Issac Alvarez recently started work at the Boise State University Micron Center for Material Research. We are doing multi-roof levels (RhinoBond & Adhered TPO 80mil roof...
Continue Reading →
Derek Matthews (project manager) and Mike Piling (foreman) are pictured with our Flynn University for the Next Generation’s mascot, Freddie.  They were showing him the work they are doing at the Sidney Safety Building in British Columbia which includes 175...
Continue Reading →
The Fishtech Cloud Security Operations Center Office Building was a multi-scope project with roofing, glazing and architectural metal. This is the second building for this fast growing cybersecurity firm rooted in Kansas City, with Flynn being part of the team...
Continue Reading →
Gateway at West District – two multi-purpose buildings with main floor retail and seven floors of residential condominiums –  epitomizes the “Total Building Envelope” saying on all of our business cards! This marks our third multi-scope project with developer and...
Continue Reading →
Transcona Library was an architecturally challenging project for Winnipeg’s metal crew, led by foreman Robert Hogue. One challenge the crew faced was the installation of 18-foot vertical wall panels and large angled soffit panels. Flynn was able to utilize TSC...
Continue Reading →
Flynn was awarded the contract to supply and install 42,000 sq. ft. of Aluminum Composite Panels, 12,000 sq. ft. of Longboard Metal Panels, 2,800 sq. ft. of Preformed Metal Cladding and 3,000 sq.ft. of Mechanical Penthouse Screen at W1 Marine...
Continue Reading →
The Aldergrove Credit Union Community Centre, owned by the Township of Langley, includes a water park with several swimming pool, water slides, a tidal pool, and a sauna/steam room, skating rink and a fitness centre. Managed by Graham Construction, Flynn...
Continue Reading →
87 Peter St. is a new condo in the Entertainment District in Toronto’s downtown core. Flynn Toronto’s architectural metals division worked with Menkes Developments Ltd. to provide 12,000 sq. ft. of 3mm thick Shiplap Aluminum Panels at the podium level,...