This summer Rui Medeiros’ Crew is busy at Bonaventure Meadows Elementary School.The job consisted of removing the existing roof system and installing two layers of polyisocyanurate insulation and a 3 Ply system with gravel on 11 different roof areas with daycare for the little ones. The guys took every precaution to continually maintain their completely safe work environment.