Green roof dirt installation on the third floor (taken just before the sedum).
The Alt Hotel, in conjunction with Bockstael Construction, is a multi-scope new construction project in downtown Saskatoon at the River Landing. Being both downtown and by the river made the delivery of materials challenging. Our work included 11,000 sq. ft. of SBS roofing, 3,000 sq. ft. of green roofing, and 26,100 sq. ft. of vertical and horizontal expansion joints. This was a LEAN construction project with a pull plan weekly. Heavy coordination with all trades was crucial. With a condo being built beside us, we had a 12” gap between sites forcing us to work alongside other trades not associated with our project!
Metals Crew from left to right: Shayne Jendruck (Safety Specialist), Artem Harutyunyan, Alan Heneghan, Ross Edwards, Colton Roy (site foreman), Tyler Walls, and Remy Smith (foreman). Missing: Harutyun Zakaryan installing approximately 26500 sq/ft of Soprema 1100T AVB Membrane, 5” cavityrock insulation with adjustable girts and stick pins and exterior Axiom panels (1184 Panels).
Roofing crew from left to right: Kevin Anaka (foreman), Justin Bomas, Leighton Cook, Brandon Lizotte, Hank Zurloff, and Tim Winslow