Posts filed under: Roofing

Jim Furtado and his crew started at the Chatham Casino on November 19, 2018 and finished in January 2019. The GC is BLT Construction Services Inc from Toronto, and the owner is Gateway Casinos. We installed 495 squares of modified...
Continue Reading →
We did 245 squares of 60 mil TPO overlay at Cascades Containerboard Packaging in St. Mary’s, Ontario. The scope of was to remove the Modified Bitumen cap sheet and BUR, while keeping the remains of the existing system in place....
Continue Reading →
Expected to open in the Summer of 2019, the new Niagara Entertainment Center which is directly connected to the Hilton Hotel, will be a 5000-seat theater playing host to some of the world’s largest performers. Our work includes 661 squares...
Continue Reading →
At Fortinos in Oakville, Ontario we’re busy pulling up the loose laid EPDM, going over the existing insulation with a SopraSmart Board and torch cap. We’re using the InvertaPress for the DuoTack. We did a whole 52 square roof area...
Continue Reading →
The crew of Mike St. Croix, Edward Clarke, Derek Butt, Gary Best, Michael Parrott (foreman), Ken Petersen (foreman) and Brandon Ward are working on a 34,400 sq. ft. 3 ply mod bit re-roof for Newfoundland Power. Weather has been a...
Continue Reading →
Working with general contractor RCS, this project is an 84,400 sq. ft. 2 ply mod bit re-roof on St. John’s largest retail shopping centre above the old Sears Canada space. It is currently under demolition and undergoing a retro-fit for...
Continue Reading →
Flynn was awarded both the mod bit re-roof (24,300 sq. ft.) and metal siding replacement at the University of Moncton. Both crews completed their scopes of work in and around snow storms and frigid temperatures! Pictured above from left to...
Continue Reading →
Flynn is back at the Kent Distribution Centre (KDC) after completing the original building in 2014. This time the crew has just completed 188,500 sq. ft. of mod bit roofing.  At one point, two Mini-Macadens were in use to accelerate...
Continue Reading →
South Peninsula Elementary is one of several new schools looking to be completed by fall, just in time for the new school year. This project which includes 343 squares of Mod Bit, marks Clinton’s first large project as foreman. He...
Continue Reading →
We have been awarded the Nova Scotia Power Headquarters re-roof project located in downtown Halifax. This project consists of removing 200 squares of TPO and replacing it with a 2 Ply Mod Bit system. There have been various challenges Chris...
Continue Reading →